| The Trees on Septic Site are Cleared (Trees arked, Felled and Removed) March 7th, 2008 |
| Wiring of Electrical System Continues (Power Outlets, Lights and Conduits) February 29th, 2008 |
| Wiring the A/V and Computer Systems (Wiring Installed for Audio, Visual and Computers) February 1st, 2008 |
| Work Continues of Building's Exterior (Exterior Trim and Entry Ways constructed) January 18th, 2008 |
| Wiring of Electrical System Begins (Power Outlets, Lights and Conduits) December 21st, 2007 |
| Weather Proofing of the Kitchen Roof (Boarding, taring and shingling of the roof) November 9th, 2007 |
| Fixing in Place of Kitchen Roof Struts (Moving, Placing, and Fixing in Place of Roof Struts) October 26th, 2007 |
| Siding, Trimming, Decking and Roof (Work continued on Siding, Trimming, Deck |
| Glazing, Decking and Siding (Installation of Doors, Decks and Siding on Upper Level) August 10th, 2007 |
| Siding and Miscellaneous Work (Roofing, Siding, Glazing, Electrical and Plumbing) July 13th, 2007 |
| Work will continue on Roof (Moving, Placing, and Fixing in Place of Roof Struts) June 29th, 2007 |
| Fixing in Place of Roof Struts (Moving, Placing, and Fixing in Place of Roof Struts) June 15th, 2007 |
| Framing of Mezzanine Level (Construction of support frame and exterior walls) June 1st, 2007 |
| Work Began on Dining Room Roof (Framing of the roof and laying of Mezzanine Footers) May 25th, 2007 |
| Framing of the Upper Level (Framing of the Interior / Exterior Walls Continued) April 20th, 2007 |
| Framing of the Upper Level (Framing of the Interior / Exterior Walls Begun) April 6th, 2007 |
| Floor of Main Level Laid (Main floor installed, plus additional framing) March 23rd, 2007 |
| Structural I-Beams Installed (Supporting I-Beam for main floor installed) February 16th, 2007 |
| Framing of the Basement Walls (Basement Walls Framed in) January 26th, 2007 |
| Basement Floor Poured (Installation of under floor heating, concrete poured) December 15th, 2006 |
| Backfilling / Leveling (Backfilling of site and leveling of floor) November 26th, 2006 |
| Basement Walls Poured (Forms built, rebar set,concrete poured ) October 20th, 2006 |
| Foundation Laid (Forms built, concrete poured, rebar set) October 6th, 2006 |
| Excavation Complete (Digging, Leveling and Preparing) September 29th, 2006 |
| Preparing the Ground (Cutting, Blasting, and Digging) September 22nd, 2006 |
| Breaking Ground (Celebration and Dedication) August 15th, 2006 |
| The Decision to Build (The Need, Prayer, and Decision) March 21st, 2006 |